905m2

Brill School

Scroll
Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

Dudelange, Luxembourg

A temporary school, lasting comfort


Modules 32
Construction time 7 months

Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

As part of renovation works on an existing school, we delivered a large-scale temporary modular facility, providing a fast, comprehensive, and perfectly tailored solution to ensure the continuity of school activities.


Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

Spread over an area of approximately 905 m², this building includes 9 classrooms, as well as all the spaces necessary for the proper functioning of a school: sanitary facilities, administrative offices, a staff room, a copy room, and other additional spaces.


A temporary solution… without compromising on comfort

Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

Designed to ensure optimal comfort, it is equipped with an air-to-water heat pump with radiators, a high-performance balanced ventilation system with heat recovery, as well as a fire detection system compliant with current standards.


Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

Particular attention was paid to the quality of the finishes to provide a pleasant and durable environment: rubber flooring, carefully finished suspended ceilings, high-performance LED lighting, dedicated fixtures for blackboards, tiled walls and floors in sanitary areas, as well as a ceiling height of 3 meters, enhancing the sense of space and comfort.


Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building

Designed as a fully-fledged school in its own right, this temporary building provides students and teaching staff with a functional, comfortable, and immediately operational environment.


Bâtiment modulaire scolaire Modulair schoolgebouw Modular school building